JANUARY 2020
Sunday, January 26 – Saturday, February 1, 2020:
Scheduled Activity, Weather Permitting
(PENDING: There is work currently scheduled for Saturday, February 1st.
Sunday, January 26, 2020
-
No scheduled construction activity.
Monday, January 27 - Friday, January 31, 2020
-
Preparation for water line tie-in at R Street NW.
-
Installation of traffic signals and pedestrian signals at T Street NW.
-
Excavation of asphalt roadway for water valve location at Q Street NW.
-
Excavation and installation of conduit for the hand box at the bus stop at R Street NW.
-
Demolition of sidewalk at Florida Avenue NW for connections to Pepco feeder vault and manhole.
-
Removal of permeable paver sidewalk for installation of geo grid at various locations within the 1300 and 1400 block of 14th Street NW.
Saturday, February 1, 2020
-
Installation of pedestrian signals, LED modules and signal heads at T Street NW.
-
Removal of temporary concrete bases and poles at W Street NW.
Sunday, January 12 – Saturday, January 18, 2020:
Scheduled Activity, Weather Permitting
(PENDING: There is work currently scheduled for Saturday, January 18th.
![](https://static.wixstatic.com/media/d5aa8e_1b6d92bb493f445697c391fb5123dd07~mv2.jpg/v1/fill/w_212,h_212,q_90/d5aa8e_1b6d92bb493f445697c391fb5123dd07~mv2.jpg)
![](https://static.wixstatic.com/media/d5aa8e_96902f63ee8a4116b24272d4cbecd67c~mv2.jpg/v1/fill/w_212,h_212,q_90/d5aa8e_96902f63ee8a4116b24272d4cbecd67c~mv2.jpg)
![](https://static.wixstatic.com/media/d5aa8e_70e8108b044e44c7ba595662f7dcc334~mv2.jpg/v1/fill/w_212,h_212,q_90/d5aa8e_70e8108b044e44c7ba595662f7dcc334~mv2.jpg)
![](https://static.wixstatic.com/media/d5aa8e_40b1d40db5f5454685c805455bb08fac~mv2.jpg/v1/fill/w_212,h_212,q_90/d5aa8e_40b1d40db5f5454685c805455bb08fac~mv2.jpg)
![](https://static.wixstatic.com/media/d5aa8e_424c14b2f6ac4c2786462378ec001b5a~mv2.jpg/v1/fill/w_212,h_212,q_90/d5aa8e_424c14b2f6ac4c2786462378ec001b5a~mv2.jpg)
![](https://static.wixstatic.com/media/d5aa8e_73723feb0a2a46489c86a47444e00cd3~mv2.jpg/v1/fill/w_212,h_212,fp_0.91_0.09,q_90/d5aa8e_73723feb0a2a46489c86a47444e00cd3~mv2.jpg)
Sunday, January 12, 2020
-
No scheduled construction activity.
Monday, January 13 - Friday, January 17, 2020
-
Work on bus islands at 14th and R Street NW (southbound).
-
Base repair at 14th and R Street NW.
-
Curb and sidewalk work at 14th and T Street NW.
-
Landscaping work being completed along the corridor.
-
installation of fiber into the Reeves Building.
-
Installation of light fixtures.
Saturday, January 18, 2020
-
Installation of fiber splicing.
Sunday, January 5 – Saturday, January 11, 2020:
Scheduled Activity, Weather Permitting
(PENDING: There is no work currently scheduled for Saturday, January 11th.
![](https://static.wixstatic.com/media/d5aa8e_a54ba8f73d7b46f19d9531e8fe42ee29~mv2.jpg/v1/fill/w_212,h_212,q_90/d5aa8e_a54ba8f73d7b46f19d9531e8fe42ee29~mv2.jpg)
![](https://static.wixstatic.com/media/d5aa8e_c5ee3a376b1a44abb644c4951c100352~mv2.jpg/v1/fill/w_212,h_212,q_90/d5aa8e_c5ee3a376b1a44abb644c4951c100352~mv2.jpg)
![](https://static.wixstatic.com/media/d5aa8e_5c0a5c05724443d880b93c32a8cf7100~mv2.jpg/v1/fill/w_212,h_212,q_90/d5aa8e_5c0a5c05724443d880b93c32a8cf7100~mv2.jpg)
![](https://static.wixstatic.com/media/d5aa8e_ca2e105d0d75445fa3b064ec88b86d21~mv2.jpg/v1/fill/w_212,h_212,q_90/d5aa8e_ca2e105d0d75445fa3b064ec88b86d21~mv2.jpg)
![](https://static.wixstatic.com/media/d5aa8e_b3633e42ae3244f7911dae211c467054~mv2.jpg/v1/fill/w_212,h_212,q_90/d5aa8e_b3633e42ae3244f7911dae211c467054~mv2.jpg)
![](https://static.wixstatic.com/media/d5aa8e_c50d600be160409487a736f267bdbfb3~mv2.jpg/v1/fill/w_212,h_212,q_90/d5aa8e_c50d600be160409487a736f267bdbfb3~mv2.jpg)
Sunday, January 5, 2020
-
No scheduled construction activity.
Monday, January 6 - Friday, January 10, 2020
-
Water tie-in at 14th and R Street NW (per DC Water's Schedule). Please note: this work is being performed overnight (Monday) to minimize the impacts of the water shut-off necessary to complete this activity.
Saturday, January 11, 2020
-
No scheduled construction activity.
Sunday, December 29 – Saturday, January 4, 2020:
Scheduled Activity, Weather Permitting
(PENDING: There is work currently scheduled for Saturday, January 4th.
![](https://static.wixstatic.com/media/d5aa8e_1d3b0686ef42455c89d32e4bec1bada2~mv2.jpg/v1/fill/w_212,h_212,q_90/d5aa8e_1d3b0686ef42455c89d32e4bec1bada2~mv2.jpg)
![](https://static.wixstatic.com/media/d5aa8e_eabaeea45a714c87af5349bd96baa066~mv2.jpg/v1/fill/w_212,h_212,q_90/d5aa8e_eabaeea45a714c87af5349bd96baa066~mv2.jpg)
![](https://static.wixstatic.com/media/d5aa8e_023f0f3518c34774a41153baa9bd6683~mv2.jpg/v1/fill/w_212,h_212,q_90/d5aa8e_023f0f3518c34774a41153baa9bd6683~mv2.jpg)
![](https://static.wixstatic.com/media/d5aa8e_e1b4ee4a625d44e9b9a40a30bd0e7944~mv2.jpg/v1/fill/w_212,h_212,q_90/d5aa8e_e1b4ee4a625d44e9b9a40a30bd0e7944~mv2.jpg)
![](https://static.wixstatic.com/media/d5aa8e_85be4bcbeaac4d0ab9bcaa6d97bfdd9c~mv2.jpg/v1/fill/w_212,h_212,q_90/d5aa8e_85be4bcbeaac4d0ab9bcaa6d97bfdd9c~mv2.jpg)
![](https://static.wixstatic.com/media/d5aa8e_06df0e3f2d074c29a66785190e049139~mv2.jpg/v1/fill/w_212,h_212,q_90/d5aa8e_06df0e3f2d074c29a66785190e049139~mv2.jpg)
Sunday, December 29, 2020
-
No scheduled construction activity.
Monday, December 30 and Tuesday, December 31, 2020
-
Bench Installation.
-
Removal of existing trash receptacles from R Street to Florida Avenue NW.
-
Excavation for signal and light pole foundation at T Street NW.
-
Installation of cable and wiring new traffic cabinet at Q Street NW.
-
Concrete work on bus island at R Street NW.
Wednesday, January 1, 2020
-
No construction activity due to the New Year's Day Holiday.
Thursday, January 2 - Friday, January 3, 2020
-
Installation of traffic signal pole foundation at Florida Avenue NW.
-
Installation of pendant poles and teardrop fixtures at Wallach Place NW.
-
Installation of granite curb for bus island at Florida Avenue NW.
-
Installation of conduit between the proposed manhole and foot light pole foundation at T Street NW.
-
Placed cold patch asphalt to restore the sidewalk over the pipe trenches for the traffic signal/light poles on the corner of T Street NW.
-
Installation of the inlet top on the storm drainage structure at the southwest corner of T Street NW.
-
Installation of porous flexible pavement.
-
Installation hand box at the southeast corner of Florida Avenue NW.
Saturday, January 4, 2020
-
Work on catch basins from N Street to T Street NW.